BAF 8.2m3 (8PE) Biocycle WWTS

The new 8PE Biocycle WWTS ( 8.2m3 BAF) is the most cost effective bioCycle™ system ever. The bioCycle™ unit is designed to provide long term low maintenance costs and unrivaled consumer protection.

  1. All Inclusive Warranty” to “2 Year Product Guarantee
  2. Longest Desludging Period
  3. Only manufactures to certified there system “fit for purpose” & to Part H of the Building Regulations
  4. Only company with ISO 9001:2000 for the Design, Supply, Installation and Servicing of WWTS
  • 15 Year All Inclusive Warranty

  • Fit For Purpose

  • Lowest Desludging Costs

  • Superior Performance

The bioCycle™ 9,000 series wastewater treatment system has a 15 year Performance, Parts & Labour guarantee from the date of installation provided that the unit is designed, serviced and operated in accordance with the manufacturer’s instructions & recommendations.

Performance

  • 20mg/l BOD
  • 30mg/l SS Effluent Quality
  • No Obnoxious Odours

All Parts

  • Concrete Tank
  • Air Blower
  • Water Pump
  • Diffusers
  • High Level switches
  • Media
  • PVC Pipework & & Fittings
  • Non return Valves
  • Control Socket Box
  • Alarm

Labour & Callouts

The bioCycle™ unit design is not just based on the number of bedrooms at the property. Our enginners will also assess the proposed water usage, occupancy and water saving devices. Our design will ensure that your wastewater treatment unit will be fit for purpose and be suitable for your home. This will help to avoid a lifetime of problems such as:

  • Liabialty under the Water Services Act 2012
  • A Risk to Human Health or the Environment
  • Restricted Usage of Washing Machine/Dishwasher
  • Increased Maintenance Costs
  • Reduced Life of Percolation Area
  • Frequent Desludging

The bioCycle™ wastewater treatment system is the highest performing biological aerated filtration (BAF) system on the Irish market. The bioCycle’s design and large capacity ensures a high and consistent level of treatment. The unit is also better equiped to deal with the following:

  • Shock Loadings
  • Diswasher & Washing Machine Usage
  • Everyday Household Chemicals
  • Water Saving Devices

The bioCycle™ unit has been designed to provide unrivaled sludge storage. When sludge is retained for a sufficient period (18 to 24 months) it will undergo a process called “anaerobic digestion”. This process decreases the volume of sludge significantly and drastically reduces the need for desludging. The desludging period for the bioCycle™ unit is approx every 7 – 10 years compared to once a year for most other treatment systems.

(Average Desludging Cost €250.00)

MANUFACTURER’S CERTIFICATION

  • Installation checked by a bioCycle™ technician
  • Test all mechanical and electrical components
  • Installation certificate provided

EPA 2009 CODE OF PRACTICE CERTIFICATION

  • Engineer on site during installation
  • Locations of system and percolation area checked
  • Photographic evidence taken of all aspects of the installation
  • Visual check of works carried out by the main contractor
  • Detailed report & certification

PART H OF THE BUILDING REGULATIONS CERTIFICATION

  • Includes Certification to EPA 2009 Code of Practice
  • Engineer on site during installation
  • Locations of system and percolation area checked
  • Photographic evidence taken of all aspects of the installation
  • Visual check of works carried out by the main contractor
  • System covered by environmental damage insurance and professional indemnity insurance
  • Detail report & certification

Part H of the Building Regulations:

“the wastewater treatment system shall be so designed, sited and constructed that:

(a) it is not prejudicial to the health of any person,
(b) it does not cause a risk to public health or the environment,
(c) it prevents unauthorised access but allows adequate means of access for emptying and maintenance,
(d) it will function to a sufficient standard for the protection of health in the event of a system failure,
(e) it has adequate capacity,
(f) it is impermeable to liquids, and
(g) it is adequately ventilated.”

Note: Part H of the Building Regulations certification can only be provided if the site suitability assessment has been carried out by bioCycle™.

Projects

Installation of Commercial bioCycle™ System & Pump Station for Oil Refinery

Installation of Commercial bioCycle™ System & Pump Station for Oil Refinery Date: September 2015 Location:…

read more

Replacement of Domestic Wastewater Treatment System

Replacement of an Domestic Wastewater Treatment System and installation of a new soil polishing filter.…

read more

Upgrade of Wastewater Treatment System For Bar/Restaurant

Upgrade of an existing malfunctioning sequential batch reactor wastewater treatment system and installation of a…

read more